- #3 #4호기 보령화력발전소 기초공사 정밀발파공법
- Cautious Blasting Works on the Po-Ryong Power Plant #3 #4 Foundation
- ㆍ 저자명
- 허진
- ㆍ 간행물명
- 技術士
- ㆍ 권/호정보
- 1988년|21권 4호|pp.12-18 (7 pages)
- ㆍ 발행정보
- 한국기술사회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
On the foundation work of Po-Ryong power plant #3 & #4. It was 30meters away from the running states of #1 & #2 plant site. In order to protect the #1 & #2 power plant facilities & factory structure. Allowable vibration was required below 0.07 gal. Therefore, it had to set up the anti-vibration trench to reduce the vibration reference and secondary. I applied the low gravity and low velocity explosives with M/S delay caps by cautious blasting pattern.