Defined is a Multi-level Parallel Machine Flow-Shop (MPMFS) which reflects some real world manufacturing situations. Just-In-Time (JIT) philosophy is applied to the MPMFS scheduling in order to achieve lowering work-in-process inventory level as well as meeting due dates. A schedule generating simulator is developed. The latest start time of each operation is determined by a backward simulation followed by another forward simulation to analyze the schedule feasibility and actual inventory level. Reasonable schedules are available through adjusting some parameters for allowance factors such as set-up times of machines and other environmental changes. The SLAMSYSTEM under Window is employed for this processing with some input/output data handling processes devised under DOS.