기관회원 [로그인]
소속기관에서 받은 아이디, 비밀번호를 입력해 주세요.
개인회원 [로그인]

비회원 구매시 입력하신 핸드폰번호를 입력해 주세요.
본인 인증 후 구매내역을 확인하실 수 있습니다.

회원가입
서지반출
분뇨처리장 방류수정화 갈대습지셀의 초기운영단계 질산성질소 제거
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • 분뇨처리장 방류수정화 갈대습지셀의 초기운영단계 질산성질소 제거
저자명
양홍모,Yang. Hongmo
간행물명
環境復元綠化
권/호정보
2004년|7권 5호|pp.100-106 (7 pages)
발행정보
한국환경복원기술학회
파일정보
정기간행물|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

$NO^3$-N removal was examined from July 2002 to December 2002 of a surface-flow constructed treatment wetland cell, which was a part of a treatment wetland system composed of four wetland cells and one distribution pond. The system was established on rice paddy near the Kohung Estuarine Lake located at the southern part of the Korean Peninsula. The lake and the paddy were formed by a salt marsh reclamation project. Effluent from a secondary-level treatment plant was funneled into the system. The investigated cell was created in June 2002. Its dimensions were 87 m in length and 14 m in width. It had an open water zone at its center, which was equivalent to 10 percent of its total area. Reeds(Phragmites australis) were transplanted from natural wetlands into the cell and their stems were cut at about 40 cm height from their bottom ends. Average 25 $m^3$/day of effluent from the plant was funneled into the cell by gravity flow and average 24.2$m^3$/day of its treated effluent was discharged into the Sinyang Stream flowing into the lake. Its water depth was maintained about 0.2 m and its hydraulic detention time averaged 5.2 days. The average height of the reed stems was 45.2 cm in July 2002 and 80.5 cm in September 2002. The number of stems averaged 40.3 stems/$m^2$ in July 2002 and 74.5 stems/$m^2$ in September 2002. The reeds were established initially well. $NO_3$-N loading rate of influent and effluent averaged 173.7 and $93.5mg/m2{cdot}day$, respectively. Removal of $NO_3$-N averaged $80.2mg/m2{cdot}day$ and its removal rate by mass was about 50 %. Considering the initial operation of the cell and the inclusion of the cold months of November and December in the analysis period, the $NO_3$-N removal rate was good.