- 연약지반 쉴드 터널 굴착시 전석장애물 탐지방법 및 보상문제
- ㆍ 저자명
- 지왕률,하상귀,Jee. Warren-Wangryul,Ha. Sang-Gui
- ㆍ 간행물명
- 한국철도학회 논문집
- ㆍ 권/호정보
- 2006년|9권 1호|pp.110-117 (8 pages)
- ㆍ 발행정보
- 한국철도학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
Boulder detection methods and its compensation is discussed with consideration of boulder conditions in soft ground tunneling by shielded TBM. For analysis of proper compensation methods for boulder obstruction, its removal costs and cases on eight projects are presented. Compensation for boulder obstruction removal by volume or weight is not practical for most tunneling situation, but compensation by crew time is probably the most equitable method. If boulders are anticipated on project, boulder removal plan must be considered with proper equipment selection.