  • 해외 플랜트 건설사업 위험요인을 통한 비용 변동범위 분석
  • A Study on the Costs Variation Range through the Risk Factors for Overseas Plant Projects
저자명
강현욱,민병준,김용수,Kang. Hyun-Wook,Min. Byoung-Jun,Kim. Yong-Su
간행물명
大韓建築學會論文集 : Journal of the architectural institute of Korea : Structure & construction / 構造系
권/호정보
2010년|26권 7호|pp.139-146 (8 pages)
발행정보
대한건축학회
파일정보
정기간행물|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

The purpose of this study is to analysis costs variation range through the risk factors for overseas plant projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each E(Engineering)P(Procurment)C(Construction) phases. The adapted research method through the questionnaire survey by plant experts was conducted for analysis of probability index and costs variation rate. Based on costs variation rate for each risk factors, the adapted research method includes application of average cost for three cases. And through Monte-Carlo Simulation, analysis of cost variation range was conducted. The results of this study are as follows: 1) The analysis of risk factors through the costs variation rate for EPC phase is Design costs variation rate -14.63%, +25.56%, Procurement costs variation rate -21.39%, +37.63%, Construction costs variation rate -31.47%, +47.07%. the analysis of costs variation range for application total average costs of three cases is to average costs 163,457 USD, maximum costs 213,710 USD, minimum costs 123,249 USD. 2) The analysis of relatively high risk factors probability index is to Design costs variation rate -7.8% +16.11%, Procurement costs variation rate -6.76%, +15.73%, Construction costs variation rate -14.72%, +25.64%. The results of costs variation range for the total average costs application of three cases is average costs 160,599 USD, maximum costs 184,635 USD, minimum costs 141,929 USD.