기관회원 [로그인]
소속기관에서 받은 아이디, 비밀번호를 입력해 주세요.
개인회원 [로그인]

비회원 구매시 입력하신 핸드폰번호를 입력해 주세요.
본인 인증 후 구매내역을 확인하실 수 있습니다.

회원가입
서지반출
BIM 건축감리 프로세스 모델 개발에 관한 연구
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • BIM 건축감리 프로세스 모델 개발에 관한 연구
저자명
김성진,Kim. Seong-Jin
간행물명
大韓建築學會論文集 : Journal of the architectural institute of Korea : Planning & design / 計劃系
권/호정보
2011년|27권 8호|pp.169-180 (12 pages)
발행정보
대한건축학회
파일정보
정기간행물|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

The purpose of this study is as follows; First, it is designed to define PQ(Pre-Qualification) requisites of inspector to execute the inspection business, and to define BIM constituents for supporting reasonable·effective inspection process. Accordingly it is intended to analyze the correlation between these respective elements, as its result and to make an exploratory study on whether each content between these elements has the complementary·synergy possibility. Second, PQ requisites of inspector to execute the inspection business shall be defined as independent variables, and BIM constituents as parameters. It is designed to decide on the adoption or dismissal of hypothesis after analyzing verifying the respective hypothesis route leading to the dependent variable of improved PQ capability of inspector through the inspection business improved by the parameters introduced to independent variables. Third, based on the verified hypotheses BIM is introduced to the inspection process, through this it is designed to propose a BIM inspection process model with the expectation effect of improving the inspection business and enhancing PQ capability. However the BIM applied scope shall be separately limited in the scope of study. Fourth, it is intended to propose an improvement on the current PQ standard for the (MLTM)Ministry of Land, Transport and Maritime Affairs to apply so that the inspector with the business capability improved through the introduction of BIM inspection process model can acquire the better PQ review score during the bidding process.