Approximate Cost Estimating Model for River Facility Construction Based on Case-Based Reasoning with Genetic Algorithms
[STEP1]서지반출 형식 선택
파일형식
@
서지도구
SNS
기타
[STEP2]서지반출 정보 선택
  • 제목
  • URL
돌아가기
확인
취소
  • Approximate Cost Estimating Model for River Facility Construction Based on Case-Based Reasoning with Genetic Algorithms
  • Approximate Cost Estimating Model for River Facility Construction Based on Case-Based Reasoning with Genetic Algorithms
저자명
Kim. Miseon,Lee. Siwook,Woo. Sungkwon,Shin. Do Hyoung
간행물명
KSCE journal of civil engineering
권/호정보
2012년|16권 3호|pp.283-292 (10 pages)
발행정보
대한토목학회
파일정보
정기간행물|ENG|
PDF텍스트
주제분야
기타
이 논문은 한국과학기술정보연구원과 논문 연계를 통해 무료로 제공되는 원문입니다.
서지반출

기타언어초록

The approximate construction cost estimation at the planning stage is very important in that it significantly affects the plan of the construction project regarding its size, budget, and construction time. However, systematic approaches for the approximate cost estimation of river facility construction at the planning stage have been rarely established. This study proposes an approximate cost estimating model for irrigation-type river facility construction at the planning stage, based on Case-Based Reasoning (CBR) with Genetic Algorithms (GA). In the development of the model, the 92 historical cases of irrigation-type river facility construction were used to compile the database of the CBR model and the 79 historical cases were used to determine the attribute weights for the model with GA. The 6 main attributes that are the only input factors required for the proposed model include embankment extension, revetment extension, freeboard, number of drain gates, number of drain pipes, and slope covering material. The results of the verification of the proposed model with the 18 historical cases indicate that the proposed model proposed is satisfactory in its application for approximate cost estimation of irrigation-type river facility construction at the planning stage. It is expected that the proposed model based on CBR with GA will contribute to easier and more convenient estimation on the approximate costs of river facility construction at the planning stage.