- 변전설비의 구조적 중요도와 고장 분석을 통한 유지보수 우선순위 선정
- ㆍ 저자명
- 이성훈,이윤성,김진오,Lee. Sung-Hun,Lee. Yun-Seong,Kim. Jin-O
- ㆍ 간행물명
- 照明·電氣設備學會論文誌
- ㆍ 권/호정보
- 2013년|27권 4호|pp.23-30 (8 pages)
- ㆍ 발행정보
- 한국조명전기설비학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
Reliability Centered Maintenance(RCM) is one of most widely used methods in the modern power system to schedule a maintenance cycle and determine the priority of inspection. A precedence study for the new structure of rearranged system should be performed due to introduction of additional installation. This paper proposes a new method to evaluate the priority of maintenance and inspection of the power system facilities. In order to calculate that risk index, it is required that the reliability block diagram should be analyzed for the power system. Additionally, a fault cause analysis is also performed through the event-tree analysis.