In this study, hydraulic flood routing is performed by 1-Di. unsteady flow model, FLDWAV on the downstream of Nakdong river. For input information, KOWACO Rainfall-Runoff Model is used and resonable boundary condition is constructed. As the result of the application about the past flood event, good agreement of comparison with observed and calculated values are show in the interesting sites, Jindong and Samrangjin. Additionally, estuary barrage\'s WSL evaluation procedure is enhanced to accurate calculation, and it is defined by downstream boundary condition in Nakdiong river. The new regressive equation to calculate the predicted tide value is developed by considering the astronomical tide and past observed tide value at Nakdong estuary barrage. The guideline\'s construction of the new application and flood forecasing system of other river basins is possible by using this studied results.