- 제약만족기법 기반의 최대부하감소를 통한 탑재 네크워크의 부하평준화
- ㆍ 저자명
- 류지성,김홍태,박진형,이병로,신종계,Ryu. Ji-Sung,Kim. Hong-Tae,Park. Jin-H,Lee. Byung-No,Shin. Jong-Gyu
- ㆍ 간행물명
- 大韓造船學會 論文集
- ㆍ 권/호정보
- 2004년|41권 5호|pp.55-62 (8 pages)
- ㆍ 발행정보
- 대한조선학회
- ㆍ 파일정보
- 정기간행물| PDF텍스트
- ㆍ 주제분야
- 기타
The logistics of entire shipbuilding process are integrated during the block erection process and the schedules for the erection process are made prior to. the schedules of any other processes. Therefore, efficient scheduling of the block erection process are one of most important issues in shipbuilding. There are only a few studies published regarding block erection scheduling methods because of its complexity and variability. This paper proposes an algorithm for diminution of maximum load based on constraint satisfaction technique. it is developed primarily for the efficiency in load leveling and applicability to the actual block erection process. The proposed algorithm is applied to actual block erection process and the results shows improvements in load leveling. It can also be used for the scheduling of fabrication, sub-assembly, and assembly to improve load leveling.